Just Announced: Lead Based Paint Protocol Update
Effective 1/30/17, all UPCS inspectors must capture a photo of the lead-based paint certification report as part of REAC inspection requirements for any property built prior to 1978. The inspector must be provided the summary of the lead-based paint inspection to satisfy HUD REAC requirements. Invoices, contractor proposals, inspector qualifications, and inspection cover pages are not substitute for the summary report and will not meet REAC requirements.
Please contact us if you have any questions.